From 7 to 31 July 2015 – Pedestrians, motorists, cyclists, chairlift
During the works on the odd side of Margit körút pedestrian traffic is ensured, however pedestrians have to pass through several temporarily narrowed sections over the pits.
Due to public utility works lanes are diverted on Margit körút between Széna tér and Dékán utca from the evening of 7 July 2015 (Tuesday). The number and the arrangement of the lanes however remain unchanged:
- on the route section between Széna tér and Széll Kálmán tér only one lane can be used per direction;
- still both lanes can be used on the route section of Margit körút ahead of Dékán utca towards Krisztina körút;
- still only one lane can be used towards Széna tér;
- while Dékán utca remains accessible from every direction.
We kindly ask cyclists to use the bypasses during the reconstruction of Széll Kálmán tér.
The area will be accessible for cyclists from the spring of 2016.
Recommended bicycle path north of the square:
Szilágyi Erzsébet fasor (Városmajor)–Retek utca–Széna tér
Recommended bicycle path south of the square:
Szilágyi Erzsébet fasor (Városmajor)–Ignotus utca–Csaba utca–Hajnóczy József utca–Vérmező
Last updated at 11:15 on Monday, 6 July 2015